While the bond issue limit is listed as not to exceed $4.0 million, the proposed General Obligation Local Option Sales and Services Tax Bonds will be for $3.2 million with a ten year term to assist in funding the following:

-Pool Construction Fund – $3,126,500

-Underwriter Discount – $ 32,000

-Cost of Issuance and Contingency – $41,500

-Total – $3,200,000

The annual debt service payments for the bond are proposed to be provided by local option sales and services taxes. As a result, staff does not believe there will be any impact to the City’s property tax rate as a result of this bond issue. However, because the proposed bond is a general obligation bond, the City Council could issue a debt service levy for the debt service payments if they desire to in the future.

In other business

-Council approved a resolution Ordering Specifications, Form of Contract, Notice to Bidders, Setting the Public Hearing, and Authorizing the Taking of Bids and Authorizing Bid Opening in Connection with Furnishing Steel Street Light Poles for the City of Pella.

This resolution sets the Public Hearing date as April 1, 2014, and authorizes the taking of bids for 47 direct embedded and 14 base mounted steel street light poles. These poles will be used in conjunction with the 2013 Southeast Distribution Conversion Project.

As background, Resolution No. 5431 was tabled at the Council meeting on February 4, 2014 so staff could research pricing on other designs of poles and fixtures. At the Policy and Planning meeting on February 18, 2014, staff presented various design options and pricing and was directed to proceed with the steel street light poles for the 2013 Southeast Distribution Conversion Project. Resolution No. 5431 has been amended to change the critical dates of the project.

-Council approved resolution accepting improvements, authorizing final payment, and closeout for the Cooling Tower Demolition Project.

This resolution accepts the improvements and authorizes final payment to Tomorrow’s Resources for the Cooling Tower Demolition Project. This project consisted of demolition of all four cells of the cooling tower along with the removal of concrete and associated piping/utilities from the site.

The project engineer, PRVN Consultants, has found that the work performed was completed in accordance with the plans and specification. The Engineer also reviewed the request for final payment documents and recommended the release of retainage of $6,700 to Tomorrow’s Resources:

-Original Contract – $134,000.00

-Payment to date – 127,300.00

Final Payment – $6,700.00

The final project costs (including final payment) are as follows:

Engineering: $43,381.89

Demolition: $134,000.00

Testing: $10,058.75

Disposal: $15,954.89

Total: $ 203,395.53

Text Only
Local News
Features
Facebook
AP Video
Raw: Japanese Soldiers Storm Beach in Exercises Raw: Weapons Fire Hits UN School in Gaza Raw: Rocket Launches Into Space With Cargo Ship Broken Water Main Floods UCLA Two Women Narrowly Avoid Being Hit by Train In Virginia, the Rise of a New Space Coast New Sanctions on Key Sectors of Russian Economy Crayola Announces Family Attraction in Orlando US Ready to Slap New Sanctions on Russia Kerry: Not Worried About Israeli Criticism Boater Rescued From Edge of Kentucky Dam Girl Struck by Plane on Florida Beach Dies Rodents Rampant in Gardens Around Louvre House to Vote on Slimmed-down Bill for Border Looming Demand Could Undercut Flight Safety Raw: 2 Shells Hit Fuel Tank at Gaza Power Plant Raw: Massive Explosions From Airstrikes in Gaza Giant Ketchup Bottle Water Tower Up for Sale Easier Nuclear Construction Promises Fall Short Kerry: Humanitarian Cease-fire Efforts Continue
Hyperlocal Search
Premier Guide
Find a business

Walking Fingers
Maps, Menus, Store hours, Coupons, and more...
Premier Guide
Obituaries